is being excavated at the Placer Creek dry stream crossing. Methinks this is a grossly overengineered and expensive solution to an erosion problem that no longer exists, but that’s just 40+ years of experience as a fluvial geomorphologist talking.
Meanwhile, elsewhere in the community, the drainage ditches that are choked with sediment from summer flooding go largely unattended. Pure negligence.